skip to main content
Go Back

'Colours Collection’ Mid Length Apron

SKU: PR151APPL

£7.99
ex VAT
Choose a colour:
Size Guide
Men's Jackets
CM
IN
US Numeric Chest Waist
XSS 0 (000) 30.5 23
XS 00 - 0 31.5 - 32.5 24 - 25
S 2 - 4 33.5 -34.5 26 - 27
M 6 - 8 35.5 - 36.5 28 - 29
L 10 - 12 37.75 - 39.25 30.25 - 31.75
XL 14 - 16 40.75 - 42.75 33.25 - 35.5
XXL 18 - 20 44.75 - 46.75 38 - 40

Buy this now

Buy 'Colours Collection’ Mid Length Apron now:

Description:

The Premier PR151 Mid‑Length Waist Apron from the Colours Collection offers vibrant branding, durable performance, and handy design—made for hospitality, café, event, or retail environments.

  • Available in one size fits all (70 cm wide x 50 cm long).
  • 90 cm waist ties allow a neat, customizable fit—tie at front or back for comfort and style.
  • Material weight 195gsm.
  • Material 65% Polyester, 35% Cotton twill.
  • Machine washable at 60 °C (domestic) or 85 °C (industrial).

Premier takes inspiration from the latest fashions. Focusing on creating trend-setting styles for staff working in the Hospitality, Corporate, Beauty and Healthcare industries. Using beautiful fabrics and a vibrant colour palette, we help businesses reinforce their brand personality through playful and practical uniform choices. 

Please feel free to contact us for any enquiries.

Delivery Information:

All orders above £150.00 (ex VAT) qualify for free standard UK delivery. A delivery charge of £7.50 (ex VAT) is applied to all orders under £150.00 (ex VAT).

Please note delivery surcharges may apply. Read full delivery information.

Brochures & Guides:

Download brochures, size guides and specifications.

PR151 'Colours Collection’ Mid Length Apron Specification
324.32 KB

How to choose the right office uniform?

1

Weight & Durability

Choose the weight and durability of the fabric required for your office uniform.

2

Colour & Style

Choose a colour and style of image wear you want.

3

Consider Aftercare

Decide if you want to Dry Clean, Easycare, or Washable Tailoring.

4

Get it Right

Build in time for fittings, then set a date for your team to start wearing their new attire.